Oklahoma Department of Transportation
FY'03 Appropriation
- In order to address the state's $350
million revenue shortfall, the department's FY'02 budget allocation
was reduced by $1.2 million (5%). The cut was managed by reducing
expenditures for routine and special maintenance projects.
- HB 2585 appropriated $229.9 million
to ODOT from General Revenue and State Transportation Funds, a 5%
decrease ($12.1 million) from the FY'02 level. This cut was necessitated
by the continued decline in state revenues. The agency will absorb
the reduction by curbing expenditures in its administrative, engineering
and maintenance divisions.
- HB 2587, the Rainy Day Bill, appropriated
an additional $17.2 million in order to fully meet bond debt obligations
($58.3 for FY'03) for Phases I and II of the Capital Improvement Program.
Interstate-40 Bridge Collapse - May
26, 2002
A 500 foot section of the almost 2,000 foot interstate bridge, just
beyond the east bank of the Arkansas River, collapsed after it was struck
by a barge at 7:41 a.m. on a Sunday morning. Fourteen people died when
their vehicles plunged into the river.

ODOT officials were on the scene within
hours of the collision, coordinating rescue efforts, debris removal
and highway detour projects. Salvage and clearing operations continued
without let-up while department contractors mobilized equipment for
the demolition efforts that would necessarily precede the reconstruction
of the fallen bridge segment.
I-40 is a major artery in the nation's
highway system; thus, the speedy repair of the downed span was of paramount
importance to both commercial interests and the traveling public. With
funding assured by Congress (1) , ODOT announced
the award of the repair contract at an emergency Transportation Commission
meeting on June 12, 2002. The Gilbert Central Corporation of Fort Worth,
Texas, submitted the winning bid of $10.9 million, with a 57 day completion
date. The contract contained an incentive/disincentive clause in the
amount of $144,000 per day ($6,000 per hour); that figure would be added
to or subtracted from the base total, depending on the number of hours/days
taken to reopen the bridge. Gary Ridley, ODOT Director, said that any
bonus Gilbert received would be far less than the loss in user costs
($430,000 per day; $22 million as of July 17) which include the following
factors: the amount of traffic per detour, speed limit, length of detour,
time traveled, delay time, extra gas, additional wear on tires, etc.
The latest estimate for disaster related costs is: recovery and demolition
expenditures - $2 million, bridge reconstruction - $11.8 million, and
$9.9 million for the repair/renovation of detour highways. These expenditures
are approximate and will change; however, the final total cost is not
expected to exceed $27 million.
The contract clock started running at 6
p.m. June 12 with two construction crews alternating twelve hour shifts,
seven days a week. Close communication and cooperation between ODOT,
other state and federal agencies and the private sector was a hallmark
of the project - a characteristic perhaps best illustrated by the trio
of retired ODOT engineers (representing over a century of construction
experience) who coordinated all aspects of the undertaking from the
specially established "Webbers Falls Residency." Professional
acumen, monetary incentives, civic responsibility and entrepreneurial
innovation all combined to bring the project to completion 10 days ahead
of schedule, earning Gilbert a $1.5 million bonus. After a brief ceremony
on July 29, one that included remarks from transportation and government
officials and a moment of silence in memory of the victims, traffic
began rolling across the bridge from both directions.

(1)
It is expected that $27 million in funding
will be authorized by Congress this fall.
Capital Improvement Program
Issue Background
In 1997 the legislature adopted HB 1629, a five-year, two phase plan
to provide $1.01 billion in new revenues for highway construction. Using
a combination of appropriated funds and bond sale proceeds, the ROADS
plan nearly doubled the annual amount spent for highways. Phase I of
the project provided $410 million in direct appropriations; $300 million
was generated by the sale of bonds in May 1998. Phase II called for
$150 million in future direct appropriations and a like amount from
bond financing.
Funding Update
FY'02 marked the final year of construction funding for Phase I; bond
debt service is $39.4 million per year through FY'07, with a final payment
of $19 million due in FY'08. Phase II ROADS funding began in FY'01,
with $150 million raised from the issue (August, 2000) of bonds; however
the $150 million in scheduled appropriations was postponed due to the
economic downturn and resulting revenue shortfall. Bond debt service
for FY'03 was $19.9 with 18.9 million due yearly through FY'12.
|
Phase I
|
(dollars in millions)
|
Phase II
|
Maintenance
Issue Background
Oklahoma ranks 1st nationally in bad bridges and 6th in bad roads. ODOT
estimates that it would take $350 million annually for four years (FY'03-FY'06)
to address the backlog of special maintenance projects (major resurfacing,
widening, bridge repair, etc.), and to fund yearly routine needs. After
that period, the department calculates its requirements at $250 million
per year. In its Budget Work Program for FY'03, ODOT requested the latter
figure, an increase of $119 million over FY'02. A department official
said this amount would allow the department "to tread water,"
that is, not to fall any further behind. However, due to the revenue
shortfall, it was not possible to meet this request.
Legislation
- HB 2360 would have modified the apportionment
of Motor Vehicle Collections by reducing the amount accruing to the
General Revenue Fund and increasing the apportionment received by
ODOT. Over a three year period the department percentage would have
risen from the current 0.31% to 15.31%, yielding an estimated $94.2
million per year of which $56.5 was earmarked for maintenance projects.
The measure was engrossed to the Senate but died in conference.
- SJR 30 called for a vote of the people
on the question of increasing motor fuel taxes by five cents per gallon
for gasoline and seven cents per gallon for diesel fuel. The measure
would have raised the rate on the former to 22 cents and the latter
to 21 cents, bringing Oklahoma up to the regional average for both;
however, it was removed from the calendar by its author.
Oklahoma Transportation (formerly Turnpike)
Authority
Revenue
OTA is a non-appropriated state agency (it receives no state or federal
dollars); all revenues derive from tolls, concessions and fines. A portion
of state excise taxes for fuels consumed on turnpikes is made available
to the agency for debt payment in the event that revenues would fall
short of debt requirements. To date that has not happened, and OTA has
"passed through" to ODOT some $250 million since 1992.
The Authority estimates toll revenues of
$179.4 million for calendar '02. During the previous five-year period
('97 - '01) receipts averaged $121 million annually; the recent increase
is attributed to turnpike extensions, a 15% toll hike and a heavier
volume of traffic.

Financial Obligations
The financial structure of the turnpike system is based on "cross-pledging":
costs incurred and revenues received are combined. Debt payment, then,
is based on the total, not on an individual turnpike within the system.
The outstanding principal on bond debt is $1.3 billion; $1.2 billion
in interest will be paid by the time the bonds are retired in 2028.
The TOTAL is $2.5 billion, that is, if no new obligations are incurred.
Debt service is $81.6 for '02; yearly payments will reach $100 million
by '06, hold steady through '22, and then fall off to the $50 million
range until retirement.
Maintenance Needs
The "Capital Improvement Program (CIP)"* identifies
maintenance (repair, rehabilitation and improvement) expenditures on
a five-year basis; the plan is updated annually. Since its inception
(1994), the CIP has devoted $290 million to maintain the turnpike system.
The current five-year plan (2002-2006) estimates expenditures of $244.6
million.
*Not
to be confused with the ODOT ROADS program
System Statistics
In January 1998, OTA was authorized to issue bonds for construction
of five new turnpike completion and/or improvement projects: Kilpatrick,
Turner, Muskogee, Will Rogers and H.E. Bailey. Bonds totaling $678 million
were issued that year; all projects are scheduled for completion during
calendar 2002. With these additions, there are now 612 turnpike miles
in Oklahoma.

|
Contact For More Information:
|
|
Prepared By:
The Oklahoma State Senate, Senate Staff
Senator Stratton Taylor, President Pro Tempore
|
|